Commissioning Academy
We're Not Just Teaching Commissioning - We're Changing the Way Projects are DeliveredWe’re Not Just Teaching Commissioning — We’re Changing the Way Projects Are Delivered
At Commissioning Academy, we believe that the biggest project failures don’t happen at the end — they’re set in motion at the beginning. That’s why we exist: to help project leaders flip the script, take control from Day 1, and lead commissioning like professionals — not afterthoughts.
We train engineers, project managers, and commissioning leaders to stop treating commissioning as “just testing” and start using it as a strategic tool to drive performance, reduce risk, and deliver success.
Built for the Real World — Not Just the Classroom
Our frameworks weren’t created in a boardroom. They were forged in the field — on massive infrastructure, energy, data center, and industrial projects that demanded precision, speed, and results under pressure.
Everything we teach is proven in the real world:
-
Commissioning plans that align with construction, not conflict with it
-
Startup sequences that eliminate chaos and guesswork
-
Execution strategies that deliver on time — without cutting corners
Whether you’re managing a billion-dollar energy facility or leading a smaller infrastructure project, our methods scale, adapt, and deliver.
Meet the Founder — Paul Turner
Paul Turner is a commissioning expert and founder of the Industrial Commissioning Association (ICxA), with over two decades of experience on major capital projects worldwide. He’s worked with utilities, EPCs, and project owners to develop and lead commissioning programs from FEED through handover.
What started as a frustration — watching good projects fall apart at the finish line — turned into a mission: raise the standard of commissioning, train the next generation of leaders, and help teams deliver successful outcomes from the very start.
What We Stand For
Our Belief: Commissioning is not a task — it’s leadership.
Our Mission: To equip you with the tools, training, and mindset to lead commissioning with confidence — from planning through performance verification.
Our Impact: Thousands of professionals across oil & gas, power, mining, water treatment, renewables, and mission-critical industries are now leading better projects because of our training.
Why It Matters
Projects don’t fail because of bad intentions. They fail because commissioning is misunderstood, mismanaged, or delayed until it’s too late. We’re changing that — one project, one leader, one system at a time.
When you join our programs, you don’t just get templates and checklists. You get a repeatable framework. A clear path. And the confidence to lead from the front.
Ready to Lead?
Explore our industry-specific commissioning programs and join a global network of professionals who are raising the bar.
👉 Explore Our Programs
👉 Become a Member of the Industrial Commissioning Association
👉 Contact Us to Work With Your Team: [email protected]

Paul Turner, P.Eng, PMP
Paul is an electrical engineer and a project management professional, and has worked on the following projects:
2300 MW 1400 km HVDC Transmission
- $5.2 billion megaproject
- 2300 MW HVDC transmission, 1400 km DC line
- Two HVDC converter stations, DC switchyards, electrode sites
- Two 230 kV AC Switchyards
- 4 230 kV Synchronous Condensers
Water Treatment: Pollution Control Center
- Upgrade plant processes to new environmental standards implementing modern biological processes
- Expand the plant facilities to accommodate larger flow volumes
- Replace obsolete control and monitoring distributed control networks

200 MW Hydro-Electric Generation
- New run-of-river hydro-electric generating station in northern Canada
- 3 70 MW turbine and generators
- Unit Control and Monitoring System
- Balance of Plant Testing and Commissioning
- 230 kV Gas Insulated Switchgear
Spacecraft Electronics
- SmallSAT Communication and Data Handling Unit Performance Verification
- MAIT: Manufacture, Assembly, Integration, and Test
- Thermal, Vibration, Temperature, Voltage, an Radiation Performance Testing
- ISS Payload Performance Verification

Booster Motor Qualification
- RATO Booster Motor – production line verification
- Qualification of booster motor performance